1. Licensing procedure |
|
|
Application number in Regulatory Authority of Energy for the issuance of the Power Production license |
Γ – 05844 |
|
|
|
|
2. Technology |
|
|
R.E.S. unit: |
wind park & photovoltaic station |
|
Storage unit |
electrochemical lead acid batteries OPzV |
|
|
|
|
Figure 1: Layout of the hybrid power plant in Kastelorizo. |
||
|
|
|
3. Siting |
|
|
Hybrid power plant installation location: |
Hill “Maderi” |
|
|
||
Figure 2: Siting of the hybrid power plant in the hill “Maderi”. |
||
|
|
|
Figure 3: 3D representation of the wind park’s siting on a wind potential map background. |
||
|
||
4. Dimensioning |
|
|
Nominal guaranteed power (MW) |
1.0 |
|
Wind park’s nominal power (kW) |
850 |
|
Photovoltaic station nominal power (kW) |
860 |
|
Batteries charging / discharging capacity (kW) |
1,440 |
|
Batteries storage nominal capacity (MWh) |
7.200 |
|
Batteries maximum discharge depth (%) |
60 |
|
|
|
|
5. Energy – environmental results |
|
|
Annual cover percentage of the electricity consumption in the autonomous insular system from the hybrid power plant: |
89.42% |
|
CO2 emission annual reduction (tn): |
2,452 (89.41%) |
|
|
|
|
Figure 4: Annual power production synthesis before the introduction of the hybrid power plant. |
||
|
||
Figure 5: Annual power production synthesis after the introduction of the hybrid power plant. |
||
|
||
Figure 6: Power production synthesis during the annual peak power demand period (August) before the introduction of the hybrid power plant. |
||
|
|
|
Figure 7: Power production synthesis during the annual peak power demand period (August) after the introduction of the hybrid power plant. |
||
|
||
Figure 8: Annual variation of the batteries strings charging level. |